Home
Deck Building Deck Replacement Composite Decking Deck Repair Deck Staining Deck Railings
About FAQ Contact Call (947) 888-3152
Deck joists framed across concrete pier blocks

Deck Building in Rochester Hills

New decks drawn, permitted and framed to the deck guide Rochester Hills adopts, with footings at 42 inches and freestanding framing wherever the house is faced in brick.

Why us

What makes a deck last thirty winters here?

Not the boards. The footings, the connections and the metal. Everything a homeowner shops for sits on top of the part nobody sees.

Footings dug to the number

42 inches to undisturbed soil, a 6 by 12 inch pad at the base, and holes near the wall taken down to the house footing elevation.

A ledger done properly, or none at all

Half-inch through-bolts staggered at 16 inches on center and flashed, or a freestanding frame if the wall is veneer.

Lateral load taken seriously

Hold-down devices at the ends of an attached deck, so the frame cannot walk away from the house sideways under a crowd.

Joist tape over the framing

A self-sealing membrane along joist and beam tops. It is the cheapest thing on the job and it protects the expensive half.

Guards that carry the load

Post connections detailed to develop the 200 pound horizontal load the code asks of a top rail, not just screwed to a rim joist.

Stairs that measure the same

Risers within an eighth of an inch of each other across the flight, with the landing pad accounted for before the stringers are cut.

At a glance

Design values a deck here is built to

What gets checkedThe value in Rochester Hills
Footing depth42 inches below grade, bearing on undisturbed soil
Footing pad6 inch by 12 inch minimum concrete at the base of each post hole
Footings near the houseWithin 5 feet of the wall, taken to house-foundation elevation
Concrete strength2,500 psi minimum
Deck loading40 psf live plus 10 psf dead
Ground snow load25 psf, the Oakland County figure in the state code table
Ledger fasteningHalf-inch through-bolts at 16 inches on center, staggered
Ledger on brick veneerNot allowed. Veneered houses get a freestanding deck
Guard height36 inches minimum wherever the walking surface is over 30 inches up
Guard openingsNothing that lets a 4 inch sphere through, including under the bottom rail
Guard load200 pounds applied horizontally at any point on the top rail
Stair geometry7 3/4 inch maximum riser, 10 inch minimum tread
Riser tolerance3/8 inch maximum difference between the tallest and shortest in a flight
HandrailRequired on any flight of four or more risers
Side setback5 feet minimum from a side property line, and nothing in an easement

How a Rochester Hills deck gets from idea to final

Four stages, and two of them are inspections the inspector will not skip.

1

Measure

We come out, measure the house and the drop in the yard, and check what the wall is clad in before anything is designed.

2

Draw and file

Plot plan and framing drawings go to the Building Department, and we register with the city before applying.

3

Dig and pour

Holes to 42 inches, inspected open, then concrete.

4

Frame and finish

Ledger or freestanding beam, joists, tape, decking, guards and stairs, then the final inspection.

Deck joists resting on concrete pier blocks Galvanized post base bracket set into a concrete pier footing
3City inspections

What building a deck here actually involves

A new deck here starts at a desk. The city wants a plot plan showing the house, the deck, setbacks, easements and utilities, plus scaled framing drawings giving footing size, post and beam spans, and joist size and spacing. Two reviews run at once, zoning and building, and the department aims for three working days. Then holes: 42 inches, undisturbed soil, a six by twelve pad at the bottom of each. The inspector sees those open, and on an attached deck comes inside to check the ledger. Only then does concrete go in. New builds, replacements, composite, repairs, refinishing and railings all run through that same sequence.

  • Scaled framing drawings
  • Setbacks and easements checked
  • Open-hole inspection before concrete
  • Interior ledger check arranged
  • Joist tape as standard
  • Written quote up front
HOW WE WORK ON EVERY DECK

Drawings before digging

Plot plan and framing plans filed, not sketched on site.

Inspections booked, never skipped

Open hole, joists on low decks, then final.

Matched metal throughout

Hot-dip galvanized or stainless, fasteners and connectors alike.

North Oakland coverage

Rochester Hills out to Oxford, Leonard and Romeo.

Service area

New decks built across north Oakland County

New builds run across Rochester Hills, from the older Avon-era plats near Rochester Road out to the hillside subdivisions north, and on into Rochester, Oakland Township, Auburn Hills, Lake Orion, Oxford and Romeo. Footing depth does not change at the city line. Only the counter does.

Rochester Hills Rochester Oakland Township Auburn Hills Lake Orion Orion Township Washington Township Pontiac Oxford Addison Township Leonard Romeo Avon Meadows Hawthorn Hills Deer Run Hitchman's Haven Estates Stony Creek Ridge Brooklands
Questions

Deck building questions from Rochester Hills homeowners

A plot plan showing the house, the proposed deck, setbacks, easements and utilities, plus construction drawings to scale with footing size, post and beam span and location, and joist span, size and spacing. Zoning and building review run at the same time, and the department aims to turn deck plans around within three working days.
200 square feet is the size trigger, but it is not the only one. Any new wood deck within 3 feet of the dwelling needs a permit whatever its size, and so does any deck forming part of an above-ground pool enclosure. A small platform out in the yard, clear of the house, is the only common case that escapes all three.
A homeowner may pull a permit for work on their own primary residence. Once you hire someone for a contract price of $600 or more, Michigan requires that person to hold a state residential builder or maintenance and alteration license, and the city requires them to register that license with the Building Department before applying.
Because that is where the ground stops freezing here. A pier that stops short of it lifts every winter and drops every spring, which racks the frame and, on an attached deck, drags the house wall with it. The city's guide also wants a 6 inch by 12 inch concrete pad at the base of every hole, bearing on undisturbed soil.
The carpentry is usually a week or two. The calendar is set by everything around it: drawings, review, the open-hole inspection before concrete, curing time, then framing and the joist inspection on a low deck, then the final. Booking drawings in winter is how you land a spring build slot rather than an August one.
Yes, and they are most of the interesting work here. Hawthorn Hills, Hidden Hills and The Sanctuary in the Hills are the kind of ground where a back door sits a full story above the yard. Those lots carry steep-slope setback restrictions, so the footprint gets confirmed with the Building Department before anything is drawn.
On a sided house, a ledger through-bolted to the rim joist with half-inch bolts staggered at 16 inches on center, flashed so water cannot get behind it, plus a lateral load connection. On a brick or stone-veneer house, nothing does: the deck stands on its own posts, because a ledger may not be supported on veneer.
To a landfill that accepts construction and demolition waste. Michigan bars open burning of construction debris outright, and treated lumber can never be burned or chipped for mulch. Older boards may be CCA-treated, which is exactly why they get hauled rather than piled up behind the garage.

Get the drawings started before the ground freezes

Send us the address and roughly what you want out the back. We measure, draw, price it in writing, and take the permit through the counter for you.

(947) 888-3152
Mon to Sat, 7am to 6pm
Call Now
Call (947) 888-3152